ISO INTERNATIONAL STANDARD 10784-3 First edition 2011-12-01 Space systems Early operations - Part 3: Commissioning report Systemes spatiaux - Opérations initiales Partie 3: Rapport d'engagement Reference number ISO 10784-3:2011(E) @ ISO 2011 E"eqr{tkijvgf'd("WPG."E1"1gpqxc."8l"4 :226"Ocftkf."Urckp*cn'tkijv ISO 10784-3:2011(E) COPYRIGHTPROTECTEDDOCUMENT ? ISO2011 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISO's member body in the country of the requester. ISO copyright office Case postale 56 · CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyright@iso.org Web www.iso.org Published in Switzerland ii E*eqr(tkijvgf'd["WPG."E1"1gpqxc.8r4:226"Octf.Urckp"cm"tkijw/.tgugtxgf*Ygf"Hgd’36*2439-56WVE"4246 @IsO2011-All rightsreserved ISO 10784-3:2011(E) Contents Page Foreword .iv Introduction. V 1 Scope. 2 Normative references 3 Terms, definitions and abbreviated terms. 3.1 Terms and definitions... 3.2 Abbreviated terms.. 4 Introduction clause of the commissioning report. 4.1 Genera... 4.2 Overall sequence of events. 5 Referenced documentation clause of the commissioning report. 2 5.1 2 5.2 Normative references. 2 5.3 Applicable references .. 2 5.4 Informative references 3 6 Nomenclature 3 7 Objective. 3 7.1 General 3 7.2 Initialization strategy matrix... 3 8 Spacecraft configuration.... 8.1 General... 8.2 Identification and general configuration matrix. 3 8.3 Deviations from planned initialization configuration 8.4 Functional configuration... 9 Operations facility configuration 9.1 General.. 9.2 Pre-mission configuration 9.3 Facility constraints and limitations 4 10 Initialization description 5 10.1 General. 5 10.2 Approach and methodology. 5 10.3 Sequence of events .. 10.4 Supporting analyses. 5 10.5 Input parameters, tolerances and limits 5 10.6 Instrumentation... 5 10.7 Successcriteria, 5 11 5 11.1 Spacecraft initialization 5 11.2 Mission payload initialization 6 12 Evaluation.. 13 Deviations. 6 14 Commissioning recommendation. 6 Bibliography. ii rwintInfl

.pdf文档 ISO 10784-3 2011 Space systems — Early operations — Part 3 Commissioning report

文档预览
中文文档 14 页 50 下载 1000 浏览 0 评论 309 收藏 3.0分
温馨提示:本文档共14页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
ISO 10784-3 2011 Space systems — Early operations — Part 3  Commissioning report 第 1 页 ISO 10784-3 2011 Space systems — Early operations — Part 3  Commissioning report 第 2 页 ISO 10784-3 2011 Space systems — Early operations — Part 3  Commissioning report 第 3 页
下载文档到电脑,方便使用
本文档由 人生无常 于 2024-08-31 09:23:41上传分享
站内资源均来自网友分享或网络收集整理,若无意中侵犯到您的权利,敬请联系我们微信(点击查看客服),我们将及时删除相关资源。